Planning a Commercial Move: Step by Step
STRESS-FREE MOVING

Planning a Commercial Move: Step by Step

Planning a business relocation by timeline: from the old lease via parking restrictions and moving day to the first customer at the new location.
Customer Service01625978461
Google · 119 reviews
(5,0/5)
Monday – Friday09:00 – 17:00 Uhr
Red van with a box body on a paved square in front of trees
OUR REMOVAL TEAM

Moving company Berlin

Planning a business relocation: the timeline up to opening

Step by step

Unsere Firma Professional on-site moving solutions with secure planning, flexible services and on-time execution.

A business relocation begins long before the first box – with the old lease. If it is for a fixed term, it ends on the agreed date; if it is open-ended, you give notice on commercial premises no later than the third working day of a quarter, effective at the end of the following quarter (§ 580a BGB). That is almost six months. In the same step, check what has to be removed or restored when you move out. Around three months beforehand, you clarify the new premises: does the approved use suit your business, are electricity and water sufficient? Panel doctors apply to the admissions committee (Zulassungsausschuss) to relocate their practice.

Around eight weeks beforehand comes the survey of both addresses, followed by the fixed price; book the electrician and plumber at the same time. Four to six weeks beforehand we apply for the parking restriction zone – in Berlin processing takes about four weeks. Two weeks beforehand you inform customers, suppliers and your bank. On moving day you notify the relocation to the trade office (§ 14 GewO: at the same time). How we move is explained under Office relocation; if you are moving home as well, see the Private move.

Sofa wrapped in stretch film, cushions and stacked moving boxes in an empty flat
€50DISCOUNT
LIMITED OFFER
PERSONAL CONSULTATION

Step three: arrange a survey

Around eight weeks beforehand: fixed price after a survey

As soon as the new lease is signed, call us on 01625978461. We arrange a free survey for your business relocation or company move, then draw up a fixed price and enter the date firmly in your timeline.

Quotes available individually based on workload, scheduling and the desired scope of services.

Two movers in red T-shirts lifting a film-wrapped piece of furniture into a lorry
STEP BY STEP

Which steps we take on

And which stay in your calendar

We are based in Berlin (Stromstraße 21) and, within the timeline of your business relocation, take on the steps around the transport: survey and fixed price, the application for the parking restriction zone, packing materials, dismantling, transport and set-up according to your floor plan. Your own calendar keeps notice, permits, tradespeople, informing customers and the re-registration. During the survey we set the dates together so that both parts fit and the business closes for as short a time as possible.

Approx. 6 months beforehand

Check the old lease and give notice in time; for open-ended commercial premises, § 580a BGB applies with a quarterly notice period.

Approx. 3 months beforehand

Check the new premises: approved use, connections, access; as a panel doctor, apply to the admissions committee for the relocation.

Approx. 8 weeks beforehand

Survey and fixed price, book tradespeople for electricity and water, draw a floor plan for counter, shelving and equipment.

4–6 weeks beforehand

Apply for the parking restriction zone; in Berlin around four weeks' processing, and the signs go up at least 72 hours in advance.
THE FINAL STEPS

How we support you

The last six steps of your business relocation – from two weeks before the date to the first week at the new location. This is where it is decided whether customers find their way and whether damage can still be reported.

01

Reliable moving service

Two weeks beforehand: inform customers, suppliers and your bank, put a sign on the door, prepare the new address in your map listing.
02

Safe handling

One week beforehand: reduce stock, sort files, label boxes according to the floor plan and get the IT service provider to confirm.
03

Clear communication

The day before: cash up the till, make a data backup, empty refrigeration units and take valuables and keys yourself.
04

Structured move planning

Moving day: till, card terminal and router first; at the same time notify the relocation to the trade office – in Berlin, the public order office of the new district.
05

Flexible support

First day afterwards: report visible damage in writing – no later than the day after delivery, hidden damage within 14 days (§ 451f HGB).
06

Hand over the old premises

Finally, hand over the old premises with a handover report, photos and meter readings, and switch the legal notice and website to the new address.
FOR THE TIMELINE

An intermediate step: shared load

The budget-friendly alternative

Warehouse stock, archive boxes or an external storeroom can be moved ahead as a separate step by shared load. Because a time window rather than a fixed date applies, plan this step with a buffer – not in the last week before opening.

Open cargo area of a red lorry with packed furniture, panels and boxes
EUROPE-WIDE MOVES

Your
move – fully organised

One team, every service

The timeline shifts depending on the business: a practice needs more lead time for permits, a workshop for high-voltage and compressed-air connections, a shop for shop fittings and the shop sign. If you are also moving home, you will find information under Private move. For pure offices without customer traffic there is the article Planning an office move; for longer distances, our pages on long-distance moves will help.

Planning safe and relaxed

A good checklist coordinates dates, helpers and materials early. That way your home move, senior move or student move in Berlin stays transparent, structured and markedly easier to control.

Furniture, boxes, transport routes

With a suitable packing service, careful furniture transport and a flexible small transport, ways can be shortened, damage avoided and even narrow approaches in Berlin managed cleanly in logistical terms.

Costs, timing and special cases

Clear time windows and suitable solutions for an office move, company move, authority move, part load or furniture taxi create reliable processes and better plannable total costs in Berlin.
Mover in red workwear pushing a sack truck with a box towards a stack of boxes
MoabitLocation: Stromstraße 21
Google 5.0 (119 reviews)
Two movers in dungarees carrying moving boxes through a bright flat
FAQ

Questions about the timeline of a business relocation

Duration, costs, liability, technology, dates, files and heavy equipment – answered briefly.
The duration of a commercial move depends on the office size and complexity. A small office with 10 staff can often be moved within a day; larger companies with extensive IT infrastructure need several days. We draw up an individual schedule for you that minimises business interruptions and takes your business hours into account.

Process of a commercial move: step by step

A successful business relocation begins with a detailed on-site inventory. We record all items to be transported, identify sensitive areas such as server rooms and draw up an individual schedule based on your business processes. Systematic preparation follows: furniture is dismantled, IT equipment properly secured and files packed according to a clear labelling system, so that nothing gets lost at the new location.

On moving day our team handles the entire transport, including dismantling and reassembling the furniture; your IT service provider reconnects the IT. After arrival there is a joint inspection, in which we check together with you whether everything has arrived complete and undamaged. That way we make sure your company can resume operations as quickly as possible.

Costs and advantages of a professional commercial move

The costs of a business relocation depend on inventory, distance, floors, access and any additional services you want. With the fixed price after a survey you know the amount before you commit – which is why the survey belongs early in the timeline, not in the last week. Compared with organising it themselves, businesses mainly save closing time and the risk of expensive damage to equipment and fittings.

In the event of damage, the moving company is liable under the German Commercial Code for up to €620 per cubic metre of goods moved; for refrigerated counters, medical equipment or machines, additional insurance on request makes sense. For your company move, the invoice is usually a business expense – keep it together with the quote.

Moving costs made transparent

Type of homeCosts from
1-room flat€344
2-room flat€615
3-room flat€879
4-room flat€1,269
House/villaindividual quote

We charge long-distance moves separately from €4.20/km. The best way to clarify details is a free survey.

What does the price of my move depend on?

First, the volume counts – the more household contents, the higher the costs. The distance is charged from €4.20/km. An upper floor without a lift and any parking restriction zone required also increase the effort. Furniture assembly and shared load are also worth considering as additional services.

Service overview for your move

Everything you need for a successful move you find here.

Move with assemblyYour furniture is professionally disassembled and assembled.
Part loadCheap and flexible for smaller quantities.
ClearanceWe clear up – fast and reliably.
Home moveYour new home is waiting; we bring you there safely.
Furniture transportSafe transport for individual pieces of furniture.
Company moveYour company move without business interruption.

Step by step to another city

A move within Germany extends the timeline: the business is registered at the new location, and we clarify parking restrictions and access for both addresses. We plan from Berlin (Stromstraße 21) – see the locations overview and Long-distance moves.