Moving checklist: every task at a glance
READY TO TICK OFF

Moving checklist: every task at a glance

With the right moving checklist you tick off flat, contracts, authorities and moving day point by point.
Customer service01625978461
Google · 119 reviews
(5,0/5)
Monday – Friday09:00 – 17:00 Uhr
Red box van on a paved square in front of trees
FORGET NOTHING

Moving checklist

The moving checklist: every task in four phases

Four phases, every task

Unsere Firma A checklist sorted by phase: preparation, organisation, moving day and the weeks after moving in.

A move involves many small and large tasks that can easily make you lose track. With a structured moving checklist you plan every step in good time and avoid last-minute stress. From giving notice on your old flat and re-registering to transporting your furniture – we show you what really matters. Whether it is a private move or a move to a new city, good preparation saves time, money and nerves.

Many points on the list have fixed deadlines: three months to give notice on a rented flat, around four weeks' processing for a parking restriction in Berlin, two weeks after moving in for registration. We take on the tasks relating to transport and point out these dates to you during the survey. Details of our services can be found on the Private move page. We quote the fixed price after the survey, and your belongings are covered under the German Commercial Code (HGB).

Sofa wrapped in stretch film, cushions and stacked moving boxes in an empty flat
50,-DISCOUNT
CHECKLIST INCLUDED
PERSONAL ADVICE

Tick one item off the list straight away

Fixed price after a survey, transparent

Simply call us on 01625978461 and receive an individual fixed-price quote for your move. We advise you free of charge on dates, moving volume and the services you need. That way you start with a clear plan and a reliable partner at your side.

Offers available individually, depending on effort, scheduling and the scope of services required.

Two movers in red T-shirts lift a film-wrapped piece of furniture into a lorry
LESS ON YOUR LIST

Which items we take off your hands

Transport, assembly, parking restriction

A moving checklist quickly reaches 40 points – you can hand some of them over. On request we take care of the parking restriction, box delivery, packing, dismantling and reassembling furniture and, of course, the transport. Our team of movers ensures a smooth process – from the survey to the last box. You receive the fixed price in writing after the survey, and your belongings are covered under the HGB. We come from Berlin (Stromstraße 21) and operate within the city, nationwide and abroad.

Parking zone

An item with a long lead time: in Berlin the district office (Bezirksamt) reckons with around four weeks. On request we apply for the zone and put up the signs in good time.

Boxes and packing

We deliver boxes a few weeks in advance, and on request we do the packing ourselves. That takes care of several lines on your checklist at once.

Assembly service

Dismantling in the old flat, assembly in the new one: beds, wardrobes and shelves are standing again by the evening – one big item fewer on the list for the first weekend.

House clearance

Whatever is left over after sorting out, we take away and dispose of properly. That way the old flat only needs to be swept clean for the handover.
CAREFULLY TICKED OFF

What makes a good moving checklist

A good checklist is sorted by timing and names deadlines. We align our dates accordingly so that every item can be completed in good time.

01

Deadlines first

At the very top are items with a statutory deadline: notice (three months), registration (two weeks after moving in) and the parking restriction with its lead time.
02

Remember the contracts

Electricity, gas, internet, insurance, the broadcasting licence fee (Rundfunkbeitrag): each contract gets a line on the list with its customer number and notice or moving deadline.
03

Documents kept separate

ID documents, tenancy agreement, landlord confirmation (Wohnungsgeberbestätigung) and handover report belong in a folder that travels with you, not in the lorry.
04

A structured moving day

Note the meter readings, take photos of the old flat, count the keys – on moving day itself, a few clear points help more than a long list.
05

A buffer for changes

If the handover is postponed, we adjust the date and the parking restriction. Build a little slack into your own list between the most important deadlines too.
06

After moving in

The list does not end on moving day: registration, vehicle registration, the broadcasting licence fee and address changes with your bank and employer follow in the first two weeks.
SMALL LOADS

Part load: an item of its own on the list

Clarify the time window early

For smaller moving volumes a part load (Beiladung) is often worthwhile, with your belongings transported together with other consignments. Your checklist then also needs to include the agreed time window and your availability on the delivery day.

Open cargo space of a red lorry with wrapped furniture, panels and boxes
PHASE BY PHASE

From
giving notice to registration

Tick off phase by phase

Alongside the classic moving checklist there are many other topics that matter for a successful move. These include the right packaging for furniture, organising parking restriction zones or the particular features of a long-distance move. You can find more about moves over long distances on the Long-distance moves page. If you look into these topics early, you save valuable time on moving day and avoid unnecessary stress.

Preparation

Give notice on the rented flat, obtain quotes, request time off, enquire about nursery or school at the new location and sort out your belongings. Whether it is a private move, senior move or student move – these items have the longest lead time.

Organisation

Apply for the parking restriction, get boxes, set up mail forwarding, transfer contracts and book the appointment at the citizens' office (Bürgeramt) for after you move in. Book a packing service, furniture transport or small transport now as well.

Moving day and afterwards

Meter readings, handover report, keys – then registration within two weeks, vehicle registration and the broadcasting licence fee. With an office move, company move, part load or furniture taxi, items of their own are added.
Mover in red workwear pushing a sack truck with a box towards a stack of boxes
MoabitBased at Stromstraße 21
Google 5.0 (119 reviews)
Two movers in dungarees carry moving boxes through a bright flat
FAQ

Frequently asked questions about the moving checklist

Answers on when to start, authorities, parking restrictions, boxes, liability and documents.
Ideally, start your moving checklist about eight weeks before the planned moving date. That leaves enough time for giving notice, re-registering and booking a moving company. Planning early also secures you better terms and avoids scheduling bottlenecks shortly before the move.

8–6 weeks before the move: the right preparation

Start organising early to avoid unnecessary stress. Notice on your rented flat should already have been given by now – the statutory notice period is three months. Find out about your new address and obtain the first quotes from a moving company. You should also apply early for a parking restriction zone (Halteverbotszone) for moving day, especially in large cities with limited parking space.

Also use this phase to review old contracts such as internet, electricity or insurance and transfer them in good time; set up mail forwarding shortly afterwards. Draw up an inventory list of your furniture to estimate the effort of the move realistically. Planning early also secures you the best dates with in-demand moving companies.

Moving day: the final checklist for a smooth process

On the actual moving day every minute counts – a clear structure helps you keep track. Make sure all boxes are labelled, important documents are to hand and the electricity and water meter readings have been noted. Our team takes care of the professional transport of your furniture and ensures a safe, swift process.

After the transport, a joint flat handover with a written report is advisable to avoid later disputes. Also check whether all furniture has arrived undamaged: report visible transport damage by the day after delivery at the latest, and hidden damage within 14 days. That way your move ends without unpleasant surprises.

On the list: the budget for transport

House/villaindividual quote
Four-room flatfrom €1,269
Three-room flatfrom €909
Two-room flatfrom €599
One-room flatfrom €339
Long-distance movefrom €4.25/km

Take advantage of our free survey to receive an individual quote.

The details the quote for your move needs

The volume of your furniture and boxes is the basis of every calculation, supplemented by the distance, which is factored in at €4.25/km. Whether there is a lift or several floors have to be climbed also affects the price. If you would like furniture assembly or a part load, you simply book these extras as well.

Items you can hand over to us

You can hand these tasks on your checklist over to us.

  • House clearance: collecting and disposing of what you have sorted out. House clearance
  • Private move: transport, carrying and loading. Private move
  • Furniture transport: individual pieces beforehand or afterwards. Furniture transport
  • Company move: its own checklist, with IT and the trade office. Company move
  • Move with assembly: dismantling and assembling furniture. Move with assembly
  • Part load: affordable for a few pieces of furniture. Part load

Checklist for moving to another city

When moving over long distances, a parking restriction at the destination and registration with a new authority are added. We come from Berlin and travel nationwide. More in the locations overview and under Long-distance moves.

Related Articles

Always one step ahead.

Subscribe to our newsletter for tips, offers and news.

Join our community.