A Move with Assembly: Avoid These Mistakes
STRESS-FREE MOVING

A Move with Assembly: Avoid These Mistakes

Mixed-up screws, no tip-over protection, cooker connected yourself: the most common mistakes in a move with assembly – and how to avoid them before moving day.
Customer Service01625978461
Google · 119 reviews
(5,0/5)
Monday – Friday09:00 – 17:00 Uhr
Red van with a box body on a paved square in front of trees
FROM BERLIN-MOABIT

Avoiding mistakes

Moving with assembly: mistakes that only show up in the new flat

Avoid these mistakes

Unsere Firma is based in Berlin-Moabit (Stromstraße 21), takes furniture apart systematically and reassembles it according to the layout plan.

The most expensive mistakes in a move with assembly rarely happen with the screwdriver. Usually something is missing beforehand: a photo of the assembled shelving, a labelled bag for the screws, a look at the ceiling height under the sloping roof. Other mistakes only show up weeks later – a wardrobe without tip-over protection, a damage report that came too late.

We take your furniture apart, collect small parts with labels and reassemble everything according to the layout plan. What we do and do not take on for assembly – such as connecting the cooker or gas appliances – is on the page move with assembly. That way you know beforehand which appointments you need to plan yourself, and nobody relies on moving day on a service that was never agreed.

Sofa wrapped in stretch film, cushions and stacked moving boxes in an empty flat
€50DISCOUNT
LIMITED OFFER
PERSONAL CONSULTATION

Rule out mistakes beforehand

Fixed price after a survey – with a clear list of what will be assembled

Many mistakes happen because nobody wrote down beforehand what should be taken apart and what mounted on the wall. During the survey we go through this with you and quote a fixed price for the move with assembly with this list. Phone: 01625978461.

Quotes available individually based on workload, scheduling and the desired scope of services.

Two movers in red T-shirts lifting a film-wrapped piece of furniture into a lorry
IN PRACTICE

Four mistakes we see most often

And how to avoid them

We are based in Berlin-Moabit (Stromstraße 21) and, for a move with assembly, take care of dismantling, transport and reassembly. Four mistakes come up again and again – almost all of them can be avoided with little effort. We are liable for damage to your belongings under § 451e HGB at €620 per cubic metre of cargo space; for expensive furniture, additional insurance makes sense.

Screws mixed up

All the screws in one tin – and nothing fits during reassembly. Each piece of furniture needs its own labelled bag attached to the furniture part.

No photo

Shelves, inserts and cables behind the TV: without a photo of the assembled state, the guesswork begins in the new flat.

Tip-over protection forgotten

Tall, narrow wardrobes should be fixed to the wall with the supplied tip-over protection – especially if children live in the household.

Cooker connected yourself

The electric cooker and hob are connected by a qualified electrician; only a registered installation company works on the gas line.
LEARNING FROM MISTAKES

Six more pitfalls

Besides the big classics, there are mistakes that only show up after the move with assembly: when the wardrobe door is first opened, when reporting damage or when asking who is actually liable.

01

Alcoves not measured

The wardrobe does not fit under the sloping ceiling or into the alcove – measure the height and width before the layout plan is fixed.
02

Chipboard overestimated

Chipboard furniture that has been taken apart many times holds screws less well; in the case of defective condition, liability may not apply.
03

Carried yourself

Whatever you take apart, load or unload yourself is to that extent not covered by the removal company's liability (§ 451d Abs. 1 Nr. 3 HGB) – say beforehand what you will do yourself.
04

Valuables in the lorry

For money, jewellery, securities and documents, the removal company's liability is excluded – they belong in your own bag.
05

No parking restriction

If the lorry is parked far away, every metre of carrying distance lengthens the day – and with it the working time you pay for.
06

Damage reported too late

Report visible damage no later than the day after delivery, hidden damage within 14 days (§ 451f HGB) – otherwise claims lapse.
FOR SMALL LOADS

Little to move? Part load!

For individual dismantled pieces of furniture

This is a common mistake too: paying for a whole lorry for two pieces of furniture. With a shared load your goods travel on the same tour as other orders. In return there is a time window instead of a fixed appointment.

Open cargo area of a red lorry with packed furniture, panels and boxes
WELL PLANNED

Before,
during, after

When each mistake happens

Mistakes in a move with assembly happen in three phases: during planning, on moving day and after reassembly. How to take individual pieces of furniture apart properly is shown in the article Dismantling and assembling furniture; if you only need assembly, furniture assembly can help.

During planning

Typical are missing measurements of the new flat, no layout plan and no list of what should be taken apart and what mounted on the wall. Appointments with a qualified electrician or gas fitter are also often booked too late.

On moving day

Full wardrobes, mixed-up screws, valuables in the lorry and no parking restriction outside the door cost the most time on moving day. Clearing out beforehand and carrying a bag with your papers yourself avoids this.

After assembly

Check doors, drawers and the tip-over protection while the team is still there. Visible damage must be reported no later than the day after delivery, hidden damage within 14 days (§ 451f HGB). Photos of damage make clarification easier.
Mover in red workwear pushing a sack truck with a box towards a stack of boxes
MoabitLocation: Stromstraße 21
Google 5.0 (119 reviews)
Two movers in dungarees carrying moving boxes through a bright flat
FAQ

Frequent questions

Mistakes when dismantling, reassembling and with liability – answered briefly.
The price depends on the type and number of pieces of furniture to be taken apart, as well as on floor, lift, carrying distances and distance. After a survey we quote a fixed price in which the assembly is listed. A common mistake is a quote without a furniture list – then it is unclear on moving day what is actually included. Phone: 01625978461.

Typical mistakes when dismantling

The most common mistake when dismantling is a lack of order: screws, wall plugs and fittings end up in a shared tin, shelves are not marked, cables are not photographed. During reassembly in the new flat this costs more time than the dismantling itself. Better: each piece of furniture gets its own labelled bag attached to the furniture part, and a photo of its assembled state.

A second mistake is misjudging the material. Chipboard wardrobes that have already been taken apart several times often have worn-out drill holes; joints can break when they are dismantled again. The law even has its own liability exclusion for this: damage resulting from the natural or defective condition of the goods may not have to be compensated by the removal company (§ 451d Abs. 1 Nr. 7 HGB). So raise such furniture during the survey – sometimes it is better to carry it in one piece or not take it at all.

Typical mistakes during reassembly

In the new flat, mistakes mainly happen when the wall does not suit the furniture. Wall cupboards and heavy shelves need a load-bearing wall and suitable wall plugs; in some older walls and in plasterboard walls, standard plugs do not hold. Ask the landlord where cables and pipes run before drilling. Uneven floors become noticeable with sliding-door wardrobes: they have to be levelled, otherwise the doors run crooked.

In the kitchen, the most dangerous mistake is connecting appliances yourself. The electric cooker and hob belong in the hands of a qualified electrician; under § 13 NDAV, work on the gas line may only be carried out by the network operator or a registered installation company. And finally: tall wardrobes without tip-over protection are a risk, especially with children. Many manufacturers supply the tip-over protection – it should not stay in the box during assembly.

Fixed prices for your move – clearly calculated

With us you always know where you stand. 1-room flats from €369, 2-room flats from €579, 3-room flats from €915 and 4-room flats from €1,309 – that is how simple our price structure is. We calculate larger properties such as houses and villas individually. If you are moving further away, you pay from €4.10 per kilometre for long-distance moves. Arrange your free survey now for a tailor-made quote.

What makes a move cheaper or more expensive?

A large volume means more work and therefore higher costs. The distance, which we charge from €4.10/km, as well as the floor and lift also noticeably affect the price. A parking restriction zone ensures smooth operations but costs extra. Additional services such as furniture assembly or a shared load can be added at any time.

Our offers for your move

Our services for your move

We take care of every detail of your move.

Shared load Shared load

Save money with combined transport.

Long-distance moves too: clarify beforehand

We are based in Berlin (Stromstraße 21) and also take care of dismantling and reassembly for moves to other cities. On long routes, the day on which reassembly takes place at the destination should be fixed beforehand. Destinations can be found in the locations overview, and routes from Berlin under long-distance moves.

Related Articles

Always one step ahead.

Subscribe to our newsletter for tips, offers and news.

Join our community.