An Office Move: Avoid These Mistakes
STRESS-FREE MOVING

An Office Move: Avoid These Mistakes

Seven typical mistakes in an office move – from the notice period to reporting damage – and how to avoid them.
Customer Service01625978461
Google · 119 reviews
(5,0/5)
Monday – Friday09:00 – 17:00 Uhr
Red van with a box body on a paved square in front of trees
OUR REMOVAL TEAM

Avoiding mistakes

Seven mistakes that make an office move unnecessarily expensive

Avoiding mistakes

Unsere Firma Typical office move mistakes: notice period, internet, files, backup, occupational safety, parking restriction and reporting damage.

Most problems in an office move do not arise on moving day but weeks beforehand. The first classic mistake: misjudging the notice period. For commercial premises, the three-month period for a flat does not apply; instead – unless the contract says otherwise – notice must be given by the third working day of a quarter to the end of the next (§ 580a BGB). Unlike with a private move, commercial leases also often run for a fixed term. The second mistake: ordering the internet connection only shortly before the move.

Mistakes three to seven: files are destroyed before the retention period has expired or dragged along unchecked, the IT is dismantled without a backup, employees carry heavy boxes themselves, the parking restriction zone is applied for too late, and damage is reported too late. Each of these points can be avoided with a fixed date in the plan – the tasks we take on are listed under company moves.

Sofa wrapped in stretch film, cushions and stacked moving boxes in an empty flat
€50DISCOUNT
LIMITED OFFER
PERSONAL CONSULTATION

Spot mistakes early: a survey before the office move

Fixed price after a survey

Many mistakes become apparent during the survey: too little time for dismantling, no goods lift, no stopping area in front of the building. Call us on 01625978461 or request a quote online – after the on-site appointment you receive a binding fixed price for your office move.

Quotes available individually based on workload, scheduling and the desired scope of services.

Two movers in red T-shirts lifting a film-wrapped piece of furniture into a lorry
AVOIDING MISTAKES

How we spot mistakes early

Check instead of improvising

During the survey we check the places where an office move most often gets stuck: access and stopping area, lift and stairwell, furniture that has to be dismantled, and equipment that is handled separately. From this comes a fixed price after a survey; we are liable for goods under the German Commercial Code (HGB). We work from Berlin (Stromstraße 21) and also handle long-distance moves; places with their own pages can be found under Locations.

Deadline missed

Commercial leases often run for a fixed term or end at the end of a quarter – if you give notice too late, you pay two rents in parallel.

No internet

Without a connection ordered in good time, the new office stands still, even if furniture and computers were set up long ago.

No backup

Dismantling computers and servers without a data backup risks more than damaged hardware – nobody can replace lost data.

Damage reported too late

Visible damage must be reported no later than the day after delivery, hidden damage within 14 days (§ 451f HGB).
CHECK BEFOREHAND

How we support you

One thing above all helps against the typical mistakes in an office move: assigning every point to a person and a date, and working through the list in good time before the move.

01

Don't destroy files too early

Accounting vouchers eight years, books and annual accounts ten (§ 147 AO): sort by deadline, not by gut feeling.
02

Don't let staff do the heavy lifting

Employers must avoid risky lifting of heavy loads or provide suitable aids (§ 2 LasthandhabV).
03

Self-packed, own risk

If you pack yourself and the packaging is inadequate, the moving company's liability for any resulting damage may not apply (§ 451d HGB).
04

Parking restriction in good time

In Berlin the service portal states a processing time of around four weeks – apply for the parking restriction zone early.
05

Don't forget the trade office

The relocation of a commercial business must be notified to the trade office (§ 14 GewO); then there are registers, banks and customers.
06

Keep staff informed

Anyone who only hears about moving day shortly beforehand packs hastily and labels badly – schedule a fixed packing day.
THE RIGHT SIZE

Small branch office? Don't plan too big

The budget-friendly alternative

A common mistake for small offices: booking an entire lorry even though only a few pieces of furniture are moving. With a shared load, your things travel on a vehicle that is heading that way anyway; a time window applies instead of a fixed date.

Open cargo area of a red lorry with packed furniture, panels and boxes
EUROPE-WIDE MOVES

Your
move – fully organised

One team, every service

Many mistakes in an office move have to do with the size of the project. Anyone who plans a relocation to another city like a move around the corner underestimates driving time, the parking restriction at two addresses and registering the business at the new location. Anyone who plans a small office like a major project, on the other hand, pays for staff nobody needs. So have the scope assessed beforehand during a survey.

Planning safe and relaxed

When employees make a private move, the same mistakes often happen: notice given too late, no parking restriction, boxes packed too full – for a senior move or student move just as in the office.

Furniture, boxes, transport routes

A missing packing service takes its toll on the archive, unsuitable furniture transport on system furniture – and for individual devices a small transport is often enough instead of a large lorry.

Costs, timing and special cases

For an office move and company move, downtime is the most expensive mistake; sending small partial loads as a shared load or by furniture taxi saves unnecessarily large vehicles.
Mover in red workwear pushing a sack truck with a box towards a stack of boxes
MoabitLocation: Stromstraße 21
Google 5.0 (119 reviews)
Two movers in dungarees carrying moving boxes through a bright flat
FAQ

Questions about typical mistakes

Lead time, costs, IT, files, liability and weekend dates – what often goes wrong in an office move.
An office move should ideally be planned at least eight to twelve weeks in advance. That way enough time remains for the organisation of notice periods, an IT move and communication with business partners. The larger the company, the earlier the move planning should begin, in order to avoid delays and additional costs.

The most frequent mistakes in the office move

The biggest mistake is too late move planning, which leads to time pressure and unnecessary costs. Many companies moreover underestimate the effort for the communication with customers, suppliers and authorities regarding the new address. Missing arrangements with landlords about handover dates too frequently cause delays in the process.

A further classic mistake is the poor labelling of moving boxes, whereby valuable time is lost in the set-up at the new site. IT security too is often neglected, when sensitive data is not sufficiently protected during the transport. With professional support, all these pitfalls can be avoided from the start.

Costs and process at a glance

The costs of an office move depend on factors such as distance, number of offices, furniture volume and additional services such as furniture assembly. After the survey you receive a fixed price for this, so it is clear from the outset what the move will cost. A personal on-site appointment helps us assess the individual effort precisely.

The typical process first includes an inventory, followed by detailed scheduling and finally the move itself, including dismantling and reassembly. We recommend ideally scheduling the move over a weekend to minimise business interruptions. That way you get off to a fully operational start at the new site.

Moving costs – clearly structured

  • 1 room → from €369
  • 2 rooms → from €584
  • 3 rooms → from €879
  • 4 rooms → from €1,279
  • House/villa → individual quote
  • Long-distance move → from €4.10/km

Arrange your free survey now for an accurate quote.

How we calculate your moving price

Distance is charged from €4.10/km, while the volume determines the basic time required. Floor and lift affect carrying time, and a parking restriction zone affects loading time. A shared load is also possible and can lower costs.

Our specialist areas in the moving service

We have specialised in various types of move, in order to help you in the best possible way.

Distance as a source of error: moving to another city

On a long-distance move of an office, planning mistakes weigh more heavily, because nothing can quickly be made up for at the destination. We plan such moves from Berlin (Stromstraße 21) and clarify the driving time, loading order and parking restriction at the destination in advance. Find out more under long-distance moves and in the locations overview.

Related Articles

Always one step ahead.

Subscribe to our newsletter for tips, offers and news.

Join our community.